Prediction of Total Cost of Construction Project with Dependent Cost Items

Full text for this resource is not available from the Research Repository.

Firouzi, A, Yang, Wei ORCID: 0000-0002-3673-6488 and Li, CQ (2016) Prediction of Total Cost of Construction Project with Dependent Cost Items. Journal of Construction Engineering and Management, 142 (12). 04016072-1 - 04016072-9. ISSN 0733-9364

Dimensions Badge

Altmetric Badge

Item type Article
URI https://vuir.vu.edu.au/id/eprint/32555
DOI 10.1061/(ASCE)CO.1943-7862.0001194
Official URL http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7...
Funders http://purl.org/au-research/grants/arc/DP140101547, http://purl.org/au-research/grants/arc/LP150100413
Subjects Historical > FOR Classification > 0104 Statistics
Historical > FOR Classification > 0905 Civil Engineering
Current > Division/Research > College of Science and Engineering
Keywords Probability distribution; Cost items; Monte Carlo simulation; Copula; Dependence structure; Cost and schedule