Prediction of Total Cost of Construction Project with Dependent Cost Items
Download
Full text for this resource is not available from the Research Repository.
Export
Firouzi, A, Yang, Wei ORCID: 0000-0002-3673-6488 and Li, CQ (2016) Prediction of Total Cost of Construction Project with Dependent Cost Items. Journal of Construction Engineering and Management, 142 (12). 04016072-1 - 04016072-9. ISSN 0733-9364
Dimensions Badge
Altmetric Badge
Item type | Article |
URI | https://vuir.vu.edu.au/id/eprint/32555 |
DOI | 10.1061/(ASCE)CO.1943-7862.0001194 |
Official URL | http://ascelibrary.org/doi/10.1061/(ASCE)CO.1943-7... |
Funders | http://purl.org/au-research/grants/arc/DP140101547, http://purl.org/au-research/grants/arc/LP150100413 |
Subjects | Historical > FOR Classification > 0104 Statistics Historical > FOR Classification > 0905 Civil Engineering Current > Division/Research > College of Science and Engineering |
Keywords | Probability distribution; Cost items; Monte Carlo simulation; Copula; Dependence structure; Cost and schedule |
Citations in Scopus | 28 - View on Scopus |
Download/View statistics | View download statistics for this item |
CORE (COnnecting REpositories)